Code of practice
PUB Code of Practice on Surface Water Drainage (7th Ed. 2018, Addendum No. 3 Apr 2025)
- On-site Detention Tank Unlock · Cl. 7.1.5 peak runoff control
- Basement Stormwater Tank and Pump Unlock · Cl. 4.9 and Cl. 10 pumped drainage
Calculators on online-calculate.com, grouped by the PUB document they follow. Check the current edition of each document with PUB. Calculations are aids; the designer and endorsing PE remain responsible.
Code of practice
Technical guide
What developers and owners should prepare for an ABC Waters project.
Open checklistAsk each consultant or contractor for the same scope items so quotations can be compared.
Open checklist